Pricing

Simple, transparent pricing

One guide rate per square metre, no hidden extras, and a fully itemised quote before any work starts.

Materials prepared on-site, priced per project.

Get a rough estimate

Drag the slider to your approximate room size. This is a guide only, every project gets a full itemised quote.

6m² (single desk) 30m² (large studio)
14m²
Estimated guide price
£23,100

Based on £1,650/m², minimum £14,500 per project.

Get My Exact Quote
What affects the price

Every quote is built around your project, not a rate card

Size & layout

Larger rooms and more complex layouts, multiple desks, a shower room, a kitchenette, cost more per project, though not always per square metre.

Access to your garden

Narrow side access, steps or a shared passageway can affect the build, though we plan around most access constraints as standard.

Cladding & finish

Your choice of external cladding and internal finish, from natural timber to painted composite, sits at different price points.

Extras

Underfloor heating, air conditioning, a green roof, or acoustic upgrades are quoted separately and itemised in your quote.

What's included in every price

OSB3 structural panels with 75mm or 100mm insulation
Electrics, sockets, lighting and consumer unit
Your choice of cladding finish
Free design consultation, before you commit to anything
A fully itemised quote, with no hidden extras
Two years of free aftercare, inspections included
Get a Free, Itemised Quote
FAQ

Pricing questions, answered

Is there a deposit?+

Yes, a deposit secures your build slot and design time, with the balance due in stages tied to progress on-site. The full schedule is set out clearly in your written quote before you commit to anything.

Are there any hidden costs?+

No. Every quote is itemised, covering the structural build, electrics, your chosen finish and any extras you've asked for. If something changes once building starts, we agree the cost with you before doing the work.

Does the price include VAT?+

We'll confirm this clearly in your written quote, along with everything else that's included, so there are no surprises at the end.

How far in advance do I need to book?+

It depends on the time of year, but as a guide, allow a few weeks between your design being finalised and a build slot becoming available.